• Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors
Back to "projects"

LIFTGESELLSCHAFT OBERGURGL GMBH

Obergurgl, TIROL

The first T-bar lift in the entire Ötztal was built by the Obergurgl lift company back in 1948.

Since then, constant investments have been made in the operation, in the technical progress of the lifts, the managed huts, in the employees and also in the right ski slope lighting.

During the planning and implementation of the new lighting, UEBEX is in close contact with the clients in order to be able to respond to their individual wishes.

The newly installed floodlight system consisting of over 100 SUPREA floodlights on the Festkogel Gaisberg is a particular focus.

Thanks to the rotationally adjustable mounting bracket and the individually pivoting light modules, the high-performance aluminum floodlight offers maximum flexibility for optimum light control.

Special production with external ballast and a light color of 5000K for daylight-like illumination can also be realized without any problems.

Luminaires in use

ATUR2 200W – 800W

High performance floodlight made of die-cast aluminium to the highest industry standard. Extremely robust and resistant housing for the toughest environmental conditions.